Planets 2

$29.00 $20.30

5 seats per quantity – License

Description

Planets 2 is a package of low-polygon 3D models optimized for game engines, consisting of 50 unique assets.

The first part of the low poly planet package – Planets.

Key Features

  • 50 models of various fantasy planets.
  • Models are optimized for game engines, easily editable and customizable. You can also use them for animations, advertising and marketing, VR/AR, 3D printing.
  • Regular updates and support. We aim to improve this package, add new resources, and constantly enhance its content.

Check Out Our Sci-Fi Collection

Sci-Fi Rooms – Sci-Fi interiors with a focus on clean, minimalist forms and highly detailed technical elements. Perfect for creating futuristic offices, laboratories, or living spaces.
Platformer Neon – Synthwave/Retrowave aesthetics. A neon color palette combined with futuristic geometry and a grid floor. A nostalgic tribute to the 1980s vision of the future.
Platformer Space – A modern take on sci-fi aesthetics with a cartoon-style approach. Features a cute and friendly design with a contrasting color palette.
Platformer Steampunk – A steampunk-inspired world with a cartoonish style. Victorian architecture, warm lighting, and the magical atmosphere of a mechanical world filled with puzzles and exploration.
Platformer Sci-Fi – Sci-Fi design with sharp geometry and a strong technical aesthetic.
Mars Spaceport – A sci-fi spaceport on Mars featuring ships and advanced technology.
Mars Colony – An expansion of the previous pack, featuring a larger and more complex colony. A visually compelling futuristic design where every element has its place and purpose.
Planets – Stylized planets where low-poly aesthetics blend with artistic expressiveness.

Technical Info

Polygon Count: 320K triangles (6.4K per model)
Scale: Planet is 20 meters in diameter
Materials: 1 material (color)
Textures: 1 texture (color). Resolution: 1024 px
Collision: Yes
File Formats: Unity, Blender, C4D, Maya, 3DSMax, FBX, OBJ, GLTF, STL

Leave a review to help us improve and expand this low poly planets pack further! Your projects are the reason we create 3D models. We genuinely care about how you use our work, and we’d love to hear your thoughts on the pack.

Version 2.1(current)
Released: Jul 12, 2025
Added:
– Separate package versions for Unity 2021+ and Unity 6000+
– Dedicated scene setups for each render pipeline (Built-in, URP, HDRP)
Fixes & Improvements:
– Fixed console warnings and removed unnecessary log messages
– Improved render pipeline converters between Built-in, URP, and HDRP

Version 2.0
Released: Jan 30, 2025
– Added new folder structure for more convenient work.
– Small improvements

Version 1.0
Released: Nov 28, 2022
– Initial release

5.00
Based on 1 review
Write a Review

  1. maks-unique (verified owner)

    nice!

    • Avatar photo

      ithappy team

      Thanks